This standard flow Skid Pro brush cutter is unmatched in class for build, drive train & cutting capacity.4 Blades, 467 lbs. flywheel, 8” cut capacity which has the biggest drive shaft (3 ¾”) of any standard flow cutter.
Brush Cutter Skid Pro 72″
Hire
-
$195.00 / Day
-
$580.00 / Week
-
$1,740.00 / Month
Hire with operator
$125.00 / Hour
This standard flow Skid Pro brush cutter is unmatched in class for build, drive train & cutting capacity.4 Blades, 467 lbs. flywheel, 8” cut capacity which has the biggest drive shaft (3 ¾”) of any standard flow cutter.
SKU: 201356-11-1-1-1-1-1-1-1-1-1-2-1-1-1-1-1-1-1-1-1
Categories: All, Lawn & Garden, Skid Steer Attachments
Additional information
Time Frame | 24 Hr, Holiday, Hourly, Minimum, Same Day, Weekly |
---|
Related products
-
9″ Auger Bit Only for Mini Skid
Hire
-
Day Rate
$35.00 / Day -
Week Rate
$140.00 / Week -
Month Rate
$420.00 / Month
Hire with operator
$17.50 / HourFeatures: Ideal for all types of dirt, concrete and even solid rock, three different auger types for all drilling applications, extra heavy-duty components that out-perform all other augers in their classCALL FOR INFO -
-
Hose, 2″ Suction 20′
Hire
-
Day Rate
$13.00 / Day -
Week Rate
$45.00 / Week -
Month Rate
$135.00 / Month
Hire with operator
$10.00 / HourThis suction hose is an accessory to the Honda 2" trash pump.CALL FOR INFO -
-
Auger Driver Only Full Size
Hire
-
Day Rate
$85.00 / Day -
Week Rate
$340.00 / Week -
Month Rate
$1,020.00 / Month
Hire with operator
$65.00 / HourThis is a full size auger driver for any quick attach that is full size. We have 6"x4', 9"x4" and 12"x4' auger bits.CALL FOR INFO -
-
Trench Compactor, BOMAG BMP 8500
Hire
-
Day Rate
$295.00 / Day -
Week Rate
$1,125.00 / Week -
Month Rate
$3,150.00 / Month
Hire with operator
$180.00 / Hour<span style="font-weight: 400;">Superior compaction.</span> <span style="font-weight: 400;">With an operating weight of around 1.6 t, this multi-purpose compactor achieves outstanding compaction results on soil compaction in trenches, sewers and on pipeline construction.</span>CALL FOR MORE INFO -